Show on map
North Bartow - South Eloise 230 kV — Transmission lineHines Energy Complex — Postponed · Gas, combined cycle · FL · 1,034 MW · 8.5 mi awayLKL Kingfisher, LLC — Postponed · Solar · FL · 6 MW · 8.6 mi awayTide Bay — Postponed · Solar · FL · 74.9 MW · 10.9 mi awayPace Road Battery Storage — Permitted · Battery storage · FL · 20 MW · 11.5 mi awayC D McIntosh Jr — Postponed · Oil · FL · 304 MW · 11.5 mi awayMattaniah Solar — Under construction · Solar · FL · 52 MW · 13.0 mi awayBrewster Solar — Under construction · Solar · FL · 40 MW · 13.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

North Bartow - South Eloise 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
12
Substations at the ends (as the source names them)
North Bartow to South Eloise
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID100520
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hines Energy Complex Postponed Gas, combined cycle 8.5 mi 1,034
LKL Kingfisher, LLC Postponed Solar 8.6 mi 6
Tide Bay Postponed Solar 10.9 mi 74.9
Pace Road Battery Storage Permitted Battery storage 11.5 mi 20
C D McIntosh Jr Postponed Oil 11.5 mi 304
Mattaniah Solar Under construction Solar 13.0 mi 52
Brewster Solar Under construction Solar 13.8 mi 40

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution