Show on map
Northern Hills 161 kV line — Transmission lineKalmar — Under construction · Solar · MN · 2.5 MW · 3.0 mi awayFranklin Heating Station — Under construction · Gas, combined cycle · MN · 27.6 MW · 4.4 mi awayRinge — Under construction · Solar · MN · 2.5 MW · 7.1 mi awayNovel Loren Solar LLC CSG — Postponed · Solar · MN · 1 MW · 7.5 mi awayMazeppa CSG — Postponed · Solar · MN · 1 MW · 13.6 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Northern Hills 161 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-MN
Owner (as stated)
Rochester Public Utilities

Details

Who’s behind it

Owner
Rochester Public Utilities

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
2
Substations at the ends (as the source names them)
Northern Hills
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itrochester public utilities
HIFLD line ID133426
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kalmar Under construction Solar 3.0 mi 2.5
Franklin Heating Station Under construction Gas, combined cycle 4.4 mi 27.6
Ringe Under construction Solar 7.1 mi 2.5
Novel Loren Solar LLC CSG Postponed Solar 7.5 mi 1
Mazeppa CSG Postponed Solar 13.6 mi 1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution