Show on map
Northern States Flambeau — Power plant · Gas, combustion turbine · Northern States Power Co - Minnesota
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Northern States Flambeau

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1969
Net generation, 2017
-178 MWh
Grid
34 kV to Northern States Power Co (MISO)
Location
Price County, Wisconsin
Operated by
Northern States Power Co - MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2017
Fuel burned MMBtu by year, 2001 to 2017
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
57 years since 1969
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2017
Capacity retired
16.3 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combustion Turbine16.3 MWRetiredDecember 2017

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
Northern States Power Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 16.3 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source