Show on map
Northwest Carrollton 345 kV line — Transmission line2501 Edmonds Ln Lewisville TX Data Center — Filed · Large load · TX · 4.0 mi awayQUALITY INVESTMENT PROPERTIES IRVING — Built · Large load · TX · 6.6 mi awayLR 1300 (Irving data centre) — Filed · Large load · TX · 6.6 mi awayAREP LAS COLINAS DATA CENTER — Under construction · Large load · TX · 6.6 mi awayQTS 6431 Longhorn Dr. Irving TX — Built · Large load · TX · 6.6 mi awayALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Built · Large load · TX · 8.4 mi awayFLEXENTIAL DATA CENTER EXPANSION — Built · Large load · TX · 8.9 mi awayEDGECORE DATACENTER - FUJITSU CAMPUS ADDITION — Large load · TX · 9.7 mi awayRAGINGWIRE DATA CENTER — Built · Large load · TX · 10.2 mi awayBANK OF AMERICA - RTX MODULAR DATA CENTER — Built · Large load · TX · 10.3 mi awayNTT TX-4 DATA CENTER — Under construction · Large load · TX · 10.3 mi awaySDC DFW-VII DATA CENTER PHASE 2 — Built · Large load · TX · 10.3 mi awayDLR 40 (Garland data centre) — Filed · Large load · TX · 10.7 mi awayDA12 (Dallas data centre) — Under construction · Large load · TX · 12.1 mi awayEXXONMOBIL DALLAS DATA CENTER — Built · Large load · TX · 12.9 mi awayCORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS — Built · Large load · TX · 13.7 mi awayEQUINIX N STEMMONS FREEWAY DALLAS — Built · Large load · TX · 14.4 mi away
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Northwest Carrollton 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX
Owner (as stated)
Oncor Electric Delivery

Details

Who’s behind it

Owner
Oncor Electric Delivery

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
11
Substations at the ends (as the source names them)
Northwest Carrollton
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itoncor electric delivery
HIFLD line ID306121
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
2501 Edmonds Ln Lewisville TX Data Center Filed Large load 4.0 mi
QUALITY INVESTMENT PROPERTIES IRVING Built Large load 6.6 mi
LR 1300 (Irving data centre) Filed Large load 6.6 mi
AREP LAS COLINAS DATA CENTER Under construction Large load 6.6 mi
QTS 6431 Longhorn Dr. Irving TX Built Large load 6.6 mi
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 8.4 mi
FLEXENTIAL DATA CENTER EXPANSION Built Large load 8.9 mi
EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown Large load 9.7 mi
RAGINGWIRE DATA CENTER Built Large load 10.2 mi
BANK OF AMERICA - RTX MODULAR DATA CENTER Built Large load 10.3 mi
NTT TX-4 DATA CENTER Under construction Large load 10.3 mi
SDC DFW-VII DATA CENTER PHASE 2 Built Large load 10.3 mi
DLR 40 (Garland data centre) Filed Large load 10.7 mi
DA12 (Dallas data centre) Under construction Large load 12.1 mi
EXXONMOBIL DALLAS DATA CENTER Built Large load 12.9 mi
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS Built Large load 13.7 mi
EQUINIX N STEMMONS FREEWAY DALLAS Built Large load 14.4 mi

Sources FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution