Show on map
Oncor 138 kV line (OSM way 1009150331) — Transmission line · OncorGrey Wolf — Under construction · Gas, combustion turbine · TX · 10 MW · 1.0 mi awayWT2 — Under construction · Gas, combustion turbine · TX · 10 MW · 5.6 mi away
  • Combustion
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Oncor 138 kV line (OSM way 1009150331)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Operated by
Oncor

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
1
All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id1009150331
RegionUS-TX
Osm typeway
Frequency60
UndergroundNo
Voltage raw138000
Voltages kv138
Scope regionsUS-TX
Voltage class100-161 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source6

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Grey Wolf Under construction Gas, combustion turbine 1.0 mi 10
WT2 Under construction Gas, combustion turbine 5.6 mi 10

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution