Paia Hydroelectric Plant
- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Paia Hydroelectric Plant: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Paia Hydroelectric Plant
Power plant · Hydro
Key facts
Power plant · Hydro Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1912
- Net generation, 2020
- 0 MWh
- Grid
- 69 kV to Maui Electric Co Ltd (HECO)
- Location
- Maui County, Hawaii
- Operated by
- Mahi Pono LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2020
- 0
MWh - Fuel burned, 2020
- 0
MMBtu - Capacity factor, 2020
- Not stated
- Heat rate, 2020
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2020 | 0 | 0 | — | — |
| 2019 | 0 | 0 | — | — |
| 2018 | 0 | 0 | — | — |
| 2017 | 0 | 0 | — | — |
| 2016 | 218 | 2,014 | 1.9% | — |
| 2015 | 7,140 | 66,538 | 62.7% | — |
| 2014 | 761 | 7,239 | 6.7% | — |
| 2013 | 3,777 | 36,037 | 33.2% | — |
| 2012 | 6,663 | 63,406 | 58.4% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.