Show on map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
Palo Verde 500 kV line: route and 16 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Palo Verde 500 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 500 kV
- States crossed
- US-AZ
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 62
- Substations at the ends (as the source names them)
- Palo Verde
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 310234 |
| Voltage class | 500 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| ATLAS Solar X, LLC Announced | Solar | 0.7 mi | 225 |
| Desert Sand BESS Filed | Solar + storage | 1.2 mi | 600 |
| ATLAS Solar XI, LLC Announced | Solar | 1.3 mi | 200 |
| Romero Energy Center Under construction | Storage | 1.3 mi | 225 |
| Romero Energy Center II, LLC Under construction | Storage | 1.3 mi | 225 |
| ATLAS Solar VI, LLC Under construction | Solar | 3.1 mi | 100 |
| Red Hawk Under construction | Gas, combustion turbine | 3.1 mi | 392 |
| ATLAS II Under construction | Solar | 3.3 mi | 100 |
| Atlas VIII Under construction | Storage | 3.3 mi | 382.4 |
| Atlas BESS IV LLC Under construction | Storage | 3.3 mi | 150 |
| ATLAS SOLAR IV Under construction | Solar | 3.3 mi | 300 |
| Centennial Flats × 2 units Under construction | Storage | 3.4 mi | 255.7 |
| Agave Under construction | Storage | 3.7 mi | 150 |
| Maricopa Solar Under construction | Storage | 4.6 mi | 550 |
| Saddleback Generation Station Announced | Gas, combined cycle | 9.1 mi | 1,250 |
Sources EIA-860M