Show on map
Poinsett - Gaco 500 kV — Transmission lineCurtis H Stanton Energy Center — Postponed · Coal · FL · 329 MW · 6.7 mi awayVERIZON ORLANDO DATA CENTER — Built · Large load · FL · 9.2 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Poinsett - Gaco 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-FL
Owner (as stated)
JEA

Details

Who’s behind it

Owner
JEA

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
49
Substations at the ends (as the source names them)
Poinsett to Gaco
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itjea
HIFLD line ID180221
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Curtis H Stanton Energy Center Postponed Coal 6.7 mi 329
VERIZON ORLANDO DATA CENTER Built Large load 9.2 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution