Show on map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Ponca City - Wichita Falls: route and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ponca City - Wichita Falls
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-OK, US-TX
- Operated by
- Phillips 66 PipelineSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 275
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PHILLIPS 66 PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Ponca City - Wichita Falls |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Ponca City Refinery Postponed | Gas, other | 0.9 mi | 5 |
| Rush Springs Solar Under construction | Solar | 1.9 mi | 200 |
| Red Hollow Renewable Energy Studied | Solar + storage | 8.5 mi | 608.6 |
| EDGEX DATA CENTERS LLC / 4442 NEWCASTLE RD Built | Large load | 9.4 mi | |
| Byers Wind Postponed | Wind | 10.3 mi | 200 |
| Horseshoe Lake Under construction | Gas, combustion turbine | 13.0 mi | 896 |
| Sooner Postponed | Coal | 13.7 mi | 950 |
Sources EIA-860M · ERCOT · EPA ICIS-Air