Show on map
Pontiac Midpoint - Dresden Station 345 kV — Transmission lineNL IL 2700 East — Under construction · Solar · IL · 5 MW · 0.0 mi awayDresden Island Hydroelectric Project — Filed · Hydro · IL · 10 MW · 0.8 mi awayGillard — Under construction · Solar · IL · 5 MW · 1.4 mi awayNL IL Braceville — Under construction · Solar · IL · 5 MW · 2.2 mi awaySV CSG North Creek 1 — Permitted · Solar · IL · 2.1 MW · 3.1 mi awayEQUINIX LLC — Built · Large load · IL · 5.4 mi awayBlackstone Wind Farm IV — Postponed · Wind · IL · 100 MW · 6.3 mi awayElwood 1-SLCHI901 — Postponed · Solar · IL · 1.3 MW · 6.9 mi awayUSS Middle Solar — Under construction · Solar · IL · 5 MW · 7.9 mi awayIllinois Generation LLC — Permitted · Wind · IL · 616.5 MW · 8.0 mi awayHeritage Prairie Solar LLC — Permitted · Solar · IL · 300 MW · 8.0 mi awayBlackstone Wind Farm III — Postponed · Wind · IL · 200 MW · 8.6 mi awayIL - Renewable Properties - Bobcat - Whi — Under construction · Solar · IL · 3 MW · 8.7 mi awayNL IL 1400 East — Under construction · Solar · IL · 5 MW · 11.8 mi awayAllen Acres Solar — Announced · Solar · IL · 150 MW · 11.9 mi awayBright Stalk Wind Farm II — Postponed · Wind · IL · 205.2 MW · 13.9 mi awayPanther Grove 2 — Under construction · Wind · IL · 472.5 MW · 13.9 mi awayIL2 - W109 — Under construction · Solar · IL · 4.9 MW · 14.1 mi away
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Pontiac Midpoint - Dresden Station 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-IL
Owner (as stated)
Commonwealth Edison

Details

Who’s behind it

Owner
Commonwealth Edison

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
43
Substations at the ends (as the source names them)
Pontiac Midpoint to Dresden Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcommonwealth edison
HIFLD line ID149207
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NL IL 2700 East Under construction Solar 0.0 mi 5
Dresden Island Hydroelectric Project Filed Hydro 0.8 mi 10
Gillard Under construction Solar 1.4 mi 5
NL IL Braceville Under construction Solar 2.2 mi 5
SV CSG North Creek 1 Permitted Solar 3.1 mi 2.1
EQUINIX LLC Built Large load 5.4 mi
Blackstone Wind Farm IV Postponed Wind 6.3 mi 100
Elwood 1-SLCHI901 Postponed Solar 6.9 mi 1.3
USS Middle Solar Under construction Solar 7.9 mi 5
Illinois Generation LLC Permitted Wind 8.0 mi 616.5
Heritage Prairie Solar LLC Permitted Solar 8.0 mi 300
Blackstone Wind Farm III Postponed Wind 8.6 mi 200
IL - Renewable Properties - Bobcat - Whi Under construction Solar 8.7 mi 3
NL IL 1400 East Under construction Solar 11.8 mi 5
Allen Acres Solar Announced Solar 11.9 mi 150
Bright Stalk Wind Farm II Postponed Wind 13.9 mi 205.2
Panther Grove 2 Under construction Wind 13.9 mi 472.5
IL2 - W109 Under construction Solar 14.1 mi 4.9

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution