Show on map
- Combustion
- Clean firm
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Loads
- In development
- Operating
- Size not stated
PPG Monroeville Chemicals Center: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
PPG Monroeville Chemicals Center
Power plant · Oil
Key facts
Power plant · Oil Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1998
- Net generation, 2025
- 0 MWh
- Grid
- 23 kV to Duquesne Light Co (PJM)
- Location
- Allegheny County, Pennsylvania
- Operated by
- PPG Monroeville Chemicals CenterSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 28 years since 1998
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 36 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | PJM |
Data notes (2)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
- Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Braddock Lock and Dam Filed | Hydro | 7.7 mi | 5.3 |
| CW Bill Young Hydropower Project Filed | Hydro | 8.1 mi | 8.4 |
| Allegheny Lock and Dam 4 Filed | Hydro | 11.9 mi | 6.4 |
| PNC PITTSBURGH DATA CENTER Built | Large load | 14.2 mi |
Sources EIA-860M · EPA ICIS-Air