Show on map
Project #1, De-Expansion #1 & #2 - Brevard County Central Disposal Facility — RNG project · Landfill gas to electricity · Energy Power PartnersVIERA DATA CENTER - PHASE 1 — Built · Large load · FL · 12.5 mi awayKENNEDY DATA CENTER — Built · Large load · FL · 13.8 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1, De-Expansion #1 & #2 - Brevard County Central Disposal Facility

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Brevard County, Florida
Operated by
Energy Power PartnersSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
6.4 MW
LFG flow to project
1.353 MMscf/d
Start year
2019

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)3.38
Landfill opened1972
Landfill closure year2023
Waste in place (tons)24,302,604
Waste in place, year2022
Landfill gas collected (MMscf/d)1.35
Landfill gas generated (MMscf/d)7.35
Direct emission reductions (MMTCO2e/yr)0.171
Avoided emissions (MMTCO2e/yr)0.016

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
VIERA DATA CENTER - PHASE 1 Built Large load 12.5 mi
KENNEDY DATA CENTER Built Large load 13.8 mi

Sources EPA ICIS-NPDES

Sources

Attribution