Show on map
Project #1, Expansion #2 - Cherry Island Landfill — RNG project · Landfill gas to electricity · Cereza EnergyJP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD — Built · Large load · DE · 1.6 mi awayDeepwater — Postponed · Gas, combustion turbine · NJ · 456 MW · 3.4 mi awayCarneys Point Solar 1 LLC — Under construction · Solar · NJ · 3 MW · 6.2 mi awayJP MORGAN CHASE - BEAR CHRISTIANA ROAD — Built · Large load · DE · 9.3 mi awayDXC TECHNOLOGY SERVICES LLC — Built · Large load · DE · 11.8 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1, Expansion #2 - Cherry Island Landfill

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
New Castle County, Delaware
Operated by
Cereza EnergySourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Steam Turbine
Technology
Landfill gas to electricity
LFG flow to project
0.8 MMscf/d
Start year
2010

Capacity not stated

All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)1.40
Landfill opened1985
Landfill closure year2060
Project shutdown year2012
Waste in place (tons)17,617,050
Waste in place, year2022
Landfill design capacity (tons)25,746,677
Landfill gas collected (MMscf/d)4.08
Landfill gas generated (MMscf/d)6.22
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
JP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD Built Large load 1.6 mi
Deepwater Postponed Gas, combustion turbine 3.4 mi 456
Carneys Point Solar 1 LLC Under construction Solar 6.2 mi 3
JP MORGAN CHASE - BEAR CHRISTIANA ROAD Built Large load 9.3 mi
DXC TECHNOLOGY SERVICES LLC Built Large load 11.8 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution