Raft River Geothermal Power Plant
Power plant · Geothermal
Key facts
Power plant · Geothermalran 63% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Net generation, 2025
- 88,141 MWh
- Grid
- 34 kV to Raft Rural Elec Coop Inc (BPAT)
- Location
- Cassia County, Idaho
- Operated by
- US Geothermal Inc.
Output
Details
Who’s behind it
Interested in this project?
- Technology
- Geothermal source: “Geothermal”
- Age
- 1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 300,738 |
| Capacity factor, 2025 | 0.629 |
| Net generation (MWh), 2025 | 88,141 |
| Balancing authority code | BPAT |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 18 MW
- Generators retired
- 1
- Capacity still in service
- 16 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Geothermal | 18 MW | Retired | March 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 34 kV
- Transmission or distribution system owner
- Raft Rural Elec Coop Inc
- Balancing authority
- Bonneville Power Administration
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Raft River Energy 1 LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
| US Geothermal Inc. | Operator | EIA-860M |
Timeline
- Stated Unit 1 scheduled to retire, 18 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Raft River Geothermal Power Plant unit 2 Postponed | Geothermal | 0.0 mi | 18 |
Sources EIA-860M