Show on map
Rio Puerco 345 kV line — Transmission lineSLO-2 — Under construction · Solar · NM · 5 MW · 2.8 mi awayCNM WESTSIDE DATA CENTER — Filed · Large load · NM · 8.1 mi awayCSC-A — Built · Large load · NM · 11.6 mi awayOso Negro — Permitted · Battery storage · NM · 100 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Rio Puerco 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NM

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
23
Substations at the ends (as the source names them)
Rio Puerco
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID306329
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SLO-2 Under construction Solar 2.8 mi 5
CNM WESTSIDE DATA CENTER Filed Large load 8.1 mi
CSC-A Built Large load 11.6 mi
Oso Negro Permitted Battery storage 14.8 mi 100

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution