Show on map
Scovill Rock - Kleen 345 kV — Transmission lineElevate Middletown — Announced · Battery storage · CT · 275 MW · 0.3 mi awayMiddletown Solar One — Postponed · Solar · CT · 2 MW · 2.3 mi awayMiddletown Solar Two — Postponed · Solar · CT · 1.9 MW · 2.3 mi awayMoodus Solar One — Postponed · Solar · CT · 2 MW · 6.7 mi awayMeriden Solar One — Postponed · Solar · CT · 1 MW · 11.4 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 12.0 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 14.8 mi away
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Scovill Rock - Kleen 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-CT
Owner (as stated)
Connecticut Light Power

Details

Who’s behind it

Owner
Connecticut Light Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
4
Substations at the ends (as the source names them)
Scovill Rock to Kleen
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itconnecticut light power
HIFLD line ID106548
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elevate Middletown Announced Battery storage 0.3 mi 275
Middletown Solar One Postponed Solar 2.3 mi 2
Middletown Solar Two Postponed Solar 2.3 mi 1.9
Moodus Solar One Postponed Solar 6.7 mi 2
Meriden Solar One Postponed Solar 11.4 mi 1
NU - WETHERSFIELD DATA CENTER Built Large load 12.0 mi
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 14.8 mi 11.5

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution