Show on map
SCS Harpswell 012903 Brunswick, LLC — Power plant · Solar · Arevon Energy, Inc.Topsham Meadow Solar Station — Filed · Solar · ME · 17.2 MW · 6.3 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

SCS Harpswell 012903 Brunswick, LLC

Power plant · Solar

Key facts

Power plant · Solarran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
7,345 MWh
Grid
12 kV to Central Maine Power Co (ISNE)
Location
Cumberland County, Maine
Operated by
Arevon Energy, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838941
Location id
L100000833249
Eia plant ids
66381
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
12
Transmission owner
Central Maine Power Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202525,062
Capacity factor, 20250.171
Net generation (MWh), 20257,345
Balancing authority codeISNE

Solar arrays

Array area (acres)
18.8
AC capacity (MW)
4.9
DC capacity (MW)
6.8
Mounting
Single-axis tracking
Site type
Superfund site
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Topsham Meadow Solar Station Filed Solar 6.3 mi 17.2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution