Show on map
Shelby Randolph Road Solar 1, LLC — Power plant · Solar · SRE Utility Solar 1, LLCBradley Farm — Postponed · Solar · NC · 5 MW · 3.6 mi awayHigh Pockets Solar — Postponed · Solar · NC · 1.9 MW · 5.5 mi awayPeanut Solar — Postponed · Solar · NC · 5 MW · 7.5 mi awayInnovative Solar 33 — Postponed · Solar · NC · 30.5 MW · 11.3 mi awayJames E. Rogers Energy Complex — Postponed · Coal · NC · 800 MW · 11.4 mi awayBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Built · Large load · NC · 12.1 mi awayCleveland Cnty Generating Facility — Postponed · Gas, combustion turbine · NC · 736 MW · 13.6 mi away
  • Wind & solar
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Shelby Randolph Road Solar 1, LLC

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
3,502 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Cleveland County, North Carolina
Operated by
SRE Utility Solar 1, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817731
Location id
L100000814914
Eia plant ids
60101
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202511,949
Capacity factor, 20250.200
Net generation (MWh), 20253,502
Balancing authority codeDUK

Solar array

Array area (acres)
7.5
AC capacity (MW)
1.9
DC capacity (MW)
2.7
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bradley Farm Postponed Solar 3.6 mi 5
High Pockets Solar Postponed Solar 5.5 mi 1.9
Peanut Solar Postponed Solar 7.5 mi 5
Innovative Solar 33 Postponed Solar 11.3 mi 30.5
James E. Rogers Energy Complex Postponed Coal 11.4 mi 800
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 12.1 mi
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 13.6 mi 736

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution