Sherburne County - Bunker Lake 345 kV — Transmission lineSherco LDES — Permitted · Storage · MN · 10 MW · 0.0 mi awaySherco BESS — Under construction · Storage · MN · 600 MW · 0.2 mi awayUNITED HEALTH GROUP NEXT TECHNOLOGY CENTER — Built · Large load · MN · 3.5 mi awayUSS Zanzibar Solar LLC CSG — Postponed · Solar · MN · 1 MW · 5.6 mi awayDATABANK MSP3 — Built · Large load · MN · 6.6 mi awayFuller Garden — Under construction · Solar · MN · 1 MW · 7.6 mi awayTC Solar RCE — Postponed · Solar · MN · 1 MW · 9.4 mi awayOPTUM TECHNOLOGY — Built · Large load · MN · 11.9 mi awayDATA RECOGNITION CORP — Built · Large load · MN · 12.6 mi awayHB FULLER CO - DATA CENTER - ARDEN HILLS — Built · Large load · MN · 13.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Sherburne County - Bunker Lake 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MN
Owner (as stated)
Northern States Power Minnesota

Details

Who’s behind it

Owner
Northern States Power Minnesota

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
37
Substations at the ends (as the source names them)
Sherburne County to Bunker Lake
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnorthern states power minnesota
HIFLD line ID135178
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sherco LDES Permitted Storage 0.0 mi 10
Sherco BESS Under construction Storage 0.2 mi 600
UNITED HEALTH GROUP NEXT TECHNOLOGY CENTER Built Large load 3.5 mi
USS Zanzibar Solar LLC CSG Postponed Solar 5.6 mi 1
DATABANK MSP3 Built Large load 6.6 mi
Fuller Garden Under construction Solar 7.6 mi 1
TC Solar RCE Postponed Solar 9.4 mi 1
OPTUM TECHNOLOGY Built Large load 11.9 mi
DATA RECOGNITION CORP Built Large load 12.6 mi
HB FULLER CO - DATA CENTER - ARDEN HILLS Built Large load 13.7 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution