Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
SMT Ironman Battery Storage Plant: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
SMT Ironman Battery Storage Plant
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Grid
- 345 kV to CenterPoint Energy (ERCO)
- Location
- Brazoria County, Texas
- Operated by
- SMT Ironman BESS LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Storage source: “Batteries”
- Age
- 1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -13,328 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -13328.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bocanova Energy Storage II Under construction | Storage | 3.8 mi | 150 |
| TX17 Nickel Prairie Storage Postponed | Storage | 10.1 mi | 100 |
| Bodkin BESS Permitted | Storage | 11.3 mi | 75 |
| Rock N' Roll Studied | Solar + storage | 12.7 mi | 358 |
| Cradle Solar Postponed | Solar | 13.1 mi | 225 |
| Cottonwood Bayou Solar Built | Solar | 13.7 mi | 351.4 |
| Berkman Storage Postponed | Storage | 14.1 mi | 100 |