South Hill - Brodnax 115 kV: route and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
South Hill - Brodnax 115 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-VA
- Owner (as stated)
- Virginia Electric Power
Details
Who’s behind it
- Owner
- Virginia Electric Power
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 6
- Substations at the ends (as the source names them)
- South Hill to Brodnax
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | virginia electric power |
| HIFLD line ID | 124886 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| MICROSOFT CORPORATION - AVC DATA CENTER Built | Large load | 1.1 mi | |
| MICROSOFT CORPORATION - AVC43 DATACENTER Built | Large load | 1.4 mi | |
| MICROSOFT CORP DCS - AVC09-AVC13 DATACENTER Built | Large load | 1.8 mi | |
| Alberta Solar Under construction | Solar | 9.2 mi | 3 |
| MICROSOFT CORP - LYH10 DATACENTER Built | Large load | 13.1 mi | |
| MICROSOFT CORPORATION - TIMBER DATA CENTER Built | Large load | 14.3 mi | |
| MICROSOFT CORP - LVL DATA CENTER Built | Large load | 14.5 mi | |
| MICROSOFT CORPORATION - EAST COAST DATA CENTER Built | Large load | 14.6 mi | |
| BN80 DATA CENTER Built | Large load | 14.8 mi |