Show on map
South Houston 138 kV line — Transmission lineTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 3.6 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 9.4 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 10.2 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 11.6 mi awayTX Houston 7080 Express Lane — Postponed · Battery storage · TX · 1.5 MW · 11.9 mi awayBerkman Storage — Postponed · Battery storage · TX · 100 MW · 12.3 mi awayBocanova Energy Storage II — Under construction · Battery storage · TX · 150 MW · 13.4 mi awayPamela Heights I Energy Center — Under construction · Battery storage · TX · 101.7 MW · 13.6 mi awayCallisto II Energy Center — Under construction · Battery storage · TX · 303.2 MW · 13.6 mi awayHidden Lakes — Postponed · Battery storage · TX · 9.9 MW · 14.9 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

South Houston 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
2
Substations at the ends (as the source names them)
South Houston
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID307026
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 3.6 mi 560
TX LaPort 10060 Porter Road Solar Postponed Solar 9.4 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 10.2 mi 25.5
Greens Bayou 6 Under construction Gas, combustion turbine 11.6 mi 445
TX Houston 7080 Express Lane Postponed Battery storage 11.9 mi 1.5
Berkman Storage Postponed Battery storage 12.3 mi 100
Bocanova Energy Storage II Under construction Battery storage 13.4 mi 150
Pamela Heights I Energy Center Under construction Battery storage 13.6 mi 101.7
Callisto II Energy Center Under construction Battery storage 13.6 mi 303.2
Hidden Lakes Postponed Battery storage 14.9 mi 9.9

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 28, 2026

Attribution