- Combustion
- Loads
- Under construction
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Under construction
- Retired
- Size not stated
Southwest Texas State University: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Southwest Texas State University
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 14% of 2007 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1989
- Net generation, 2007
- 7,361 MWh
- Location
- Hays County, Texas
- Operated by
- Texas State University - San MarcosSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 37 years since 1989
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | ERCO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2013
- Capacity retired
- 6 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Natural Gas Internal Combustion Engine | 6 MW | Retired | January 2013 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- ERCO
Transmission lines within 15 mi (10)
- 138 kV line (OSM way 342673624)
- San Marcos Electric Utilities 138 kV line (OSM way 342424260)
- 138 kV line (OSM way 342673629)
- 138 kV line (OSM way 15278181)
- 138 kV line (OSM way 118145781)
- 138 kV line (OSM way 342424250)
- 138 kV line (OSM way 300990174)
- 138 kV line (OSM way 342424280)
- 69 kV line (OSM way 15278872)
- 138 kV line (OSM way 341351738)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GEN1 scheduled to retire, 6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CLOUDBURST DATA CENTERS Under construction | Large load | 9.4 mi |
Sources EPA ICIS-NPDES