- Unspecified fuel
- Operating
- 10 · 100 · 1,000 MW
Map
- Unspecified fuel
- Operating
St. Mary Clean Energy Center: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
St. Mary Clean Energy Center
Power plant · Other
Key facts
Power plant · Otherran 41% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- 181,284 MWh
- Grid
- 34 kV to Cleco Power LLC (MISO)
- Location
- St Mary County, Louisiana
- Operated by
- Cleco Power LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 181,284
MWh - Fuel burned, 2025
- 618,541
MMBtu - Capacity factor, 2025
- 40.7
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 181,284 | 618,541 | 40.7% | — |
| 2024 | 201,188 | 686,452 | 45.0% | — |
| 2023 | 218,827 | 746,638 | 49.1% | — |
| 2022 | 240,761 | 821,476 | 54.0% | — |
| 2021 | 206,060 | 1,822,395 | 46.2% | — |
| 2020 | 179,664 | 1,575,115 | 40.2% | — |
| 2019 (5 of 12 months) | 84,729 | 754,512 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.