Stickney Water Reclamation Plant
- Combustion
- Wind & solar
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Stage not stated
- Size not stated
Stickney Water Reclamation Plant: location and 35 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Stickney Water Reclamation Plant
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1991
- Net generation, 2003
- 0 MWh
- Location
- Cook County, Illinois
- Operated by
- MWRD:W/SW FacilitySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
- Technology
- Biomass source: “Other Waste Biomass”
- Age
- 35 years since 1991
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2006
- Capacity retired
- 3 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN4 | Other Waste Biomass | 3 MW | Retired | September 2006 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GEN4 scheduled to retire, 3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| McCook 2-SLCHI102 Under construction | Solar | 2.9 mi | 2 |
| Cicero 3-SLCHI603 Under construction | Solar | 3.4 mi | 1.9 |
| QUALITY TECHNOLOGY SERVICES LLC Built | Large load | 5.4 mi | |
| ITT Cogen Facility Under construction | Gas, reciprocating engine | 7.1 mi | 8.2 |
| TIERPOINT ILLINOIS LLC Built | Large load | 7.4 mi | |
| HYDRAVAULT LLC Built | Large load | 7.5 mi | |
| EQUINIX LLC Built | Large load | 8.0 mi | |
| LEGACY GI 400 LASALLE LLC Unknown | Large load | 8.0 mi | |
| DIGITAL REALTY TRUST LP Built | Large load | 8.1 mi | |
| DIGITAL GRAND AVENUE 3 LLC Built | Large load | 9.0 mi | |
| DLR 9311 (Franklin Park data centre) Filed | Large load | 9.2 mi | |
| IL - SMHEC - Moraine Valley Postponed | Solar | 9.2 mi | 1.3 |
| FRANKLIN PARK (CHI22) DATA CENTER Built | Large load | 9.2 mi | |
| CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built | Large load | 9.3 mi | |
| W Belmont Ave Under construction | Solar | 9.6 mi | 1.4 |
| Northlake 2-SLCHI302 Under construction | Solar | 9.9 mi | 1.6 |
| Franklin Park 2-SLCHI802 Under construction | Solar | 10.3 mi | 1.2 |
| Northlake 3-SLCHI303 Under construction | Solar | 10.3 mi | 1.6 |
| Aligned (Northlake data centre) Built | Large load | 10.4 mi | |
| NALCO WATER Built | Large load | 10.4 mi | |
| Northlake 4-SLCHI304 Under construction | Solar | 10.8 mi | 1.4 |
| Northlake 5-SLCHI305 Under construction | Solar | 11.1 mi | 2.5 |
| MICROSOFT CORP-CHICAGO DATA CENTER Built | Large load | 11.1 mi | |
| T5@CHICAGO III LP Built | Large load | 11.3 mi | |
| T5 Data Center Northlake Filed | Large load | 11.3 mi | |
| Copenhagen Ct Under construction | Solar | 11.6 mi | 3.5 |
| Robbins Community Power LLC Postponed | Biomass | 11.9 mi | 55 |
| Melrose Park 2-SLCHI547 Under construction | Solar | 12.5 mi | 3 |
| 360 TCS LLC Built | Large load | 12.6 mi | |
| ENSONO DATA CENTER Built | Large load | 13.4 mi | |
| Bensenville 2-SLCHI526 Under construction | Solar | 14.5 mi | 1.9 |
| Bensenville 14-SLCHI414 Under construction | Solar | 14.8 mi | 1.3 |
| Bensenville Ind Park 10-SLCHI410 Under construction | Solar | 14.9 mi | 1.2 |
| Bensenville Ind Park 6-SLCHI406 Postponed | Solar | 15.0 mi | 1.1 |
| Bensenville Ind Park 11 Under construction | Solar | 15.0 mi | 1.2 |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES