Show on map
Sylmar West - Station J 230 kV — Transmission lineVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 0.6 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 2.2 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 3.9 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 6.8 mi awaySix Flags Magic Mountain — Under construction · Solar + storage · CA · 12 MW · 10.1 mi awayLas Virgenes MWD - Composting Plant — Under construction · Solar + storage · CA · 1.4 MW · 11.3 mi awayHumidor Storage I — Contracted · Storage · CA · 300 MW · 12.3 mi awayHomestead Energy Storage LLC — Postponed · Storage · CA · 14 MW · 14.1 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Sylmar West - Station J 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Los Angeles Department Of Water Power

Details

Who’s behind it

Owner
Los Angeles Department Of Water Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
10
Substations at the ends (as the source names them)
Sylmar West to Station J
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itlos angeles department of water power
HIFLD line ID303018
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Van Norman Bypass Solar Project Postponed Solar 0.6 mi 2
20525 Nordhoff PV (North) Under construction Solar 2.2 mi 1.9
AB Van Nuys Announced Solar 3.9 mi 1.6
Foothill Solar Project Postponed Solar 6.8 mi 1.1
Six Flags Magic Mountain Under construction Solar + storage 10.1 mi 12
Las Virgenes MWD - Composting Plant Under construction Solar + storage 11.3 mi 1.4
Humidor Storage I Contracted Storage 12.3 mi 300
Homestead Energy Storage LLC Postponed Storage 14.1 mi 14

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 26, 2026Source: California ISO

Attribution