Texas City Plant Union Carbide — Power plant · Other · Union Carbide Corp-Texas CityZeya — Under construction · Storage · TX · 255.3 MW · 0.9 mi awayRed Egret — Under construction · Storage · TX · 310.6 MW · 4.8 mi awayVertus Energy Storage Plant — Studied · Storage · TX · 204.9 MW · 5.7 mi awayHidden Lakes — Postponed · Storage · TX · 9.9 MW · 9.6 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 11.9 mi awayWillow Beach Wind — Contracted · Wind · TX · 202.3 MW · 14.3 mi away
  • Wind & solar
  • Storage
  • Unspecified fuel
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Texas City Plant Union Carbide

Power plant · Other

Key facts

Power plant · Otherran 37% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1996
Net generation, 2025
82,810 MWh
Grid
138 kV to Texas-New Mexico Power Co (ERCO)
Location
Galveston County, Texas

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Other source: “All Other”
Age
30 years since 1996
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000505524
NAICS code
325110
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1002460
Fuel burned (MMBtu), 2025282,546
Capacity factor, 20250.366
Net generation (MWh), 202582,810
Balancing authority codeERCO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 3412.0 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
40 MW
Generators retired
1
Capacity still in service
25.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GTGNatural Gas Fired Combustion Turbine40 MWRetiredOctober 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Texas-New Mexico Power Co
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Connection points within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
DOW CHEMICAL COMPANY Owner 100.0% Dec 31, 2023 EPA GHGRP
Union Carbide Corp-Texas City Operator EIA-860M

Timeline

  • Stated Unit GTG scheduled to retire, 40 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Zeya Under construction Storage 0.9 mi 255.3
Red Egret Under construction Storage 4.8 mi 310.6
Vertus Energy Storage Plant Studied Storage 5.7 mi 204.9
Hidden Lakes Postponed Storage 9.6 mi 9.9
Berkman Storage Postponed Storage 11.9 mi 100
Willow Beach Wind Contracted Wind 14.3 mi 202.3

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026