Texas City Plant Union Carbide
Power plant · Other
Key facts
Power plant · Otherran 37% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1996
- Net generation, 2025
- 82,810 MWh
- Grid
- 138 kV to Texas-New Mexico Power Co (ERCO)
- Location
- Galveston County, Texas
- Operated by
- Union Carbide Corp-Texas City
Output
- Gas
Details
Who’s behind it
- Owner
- DOW Chemical Company
Interested in this project?
- Technology
- Other source: “All Other”
- Age
- 30 years since 1996
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 282,546 |
| Capacity factor, 2025 | 0.366 |
| Net generation (MWh), 2025 | 82,810 |
| Balancing authority code | ERCO |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 3412.0 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 40 MW
- Generators retired
- 1
- Capacity still in service
- 25.8 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GTG | Natural Gas Fired Combustion Turbine | 40 MW | Retired | October 2014 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Texas-New Mexico Power Co
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 15 mi (10)
- 138 kV line (OSM way 584135161)
- Texas-New Mexico Power 138 kV line (OSM way 584135165)
- PNM 138 kV line (OSM way 338794646)
- 138 kV line (OSM way 584135162)
- Power cable, voltage not stated (OSM way 584370762)
- 138 kV line (OSM way 584370770)
- Power cable, voltage not stated (OSM way 584370761)
- 138 kV line (OSM way 584370767)
- 138 kV line (OSM way 338819907)
- Power cable, voltage not stated (OSM way 584370760)
Connection points within 15 mi (4)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| DOW CHEMICAL COMPANY | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Union Carbide Corp-Texas City | Operator | EIA-860M |
Timeline
- Stated Unit GTG scheduled to retire, 40 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · OpenStreetMap · ERCOT · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- ERCOT
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Zeya Under construction | Storage | 0.9 mi | 255.3 |
| Red Egret Under construction | Storage | 4.8 mi | 310.6 |
| Vertus Energy Storage Plant Studied | Storage | 5.7 mi | 204.9 |
| Hidden Lakes Postponed | Storage | 9.6 mi | 9.9 |
| Berkman Storage Postponed | Storage | 11.9 mi | 100 |
| Willow Beach Wind Contracted | Wind | 14.3 mi | 202.3 |