- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
TNSG South Plant: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
TNSG South Plant
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1992
- Net generation, 2025
- -300 MWh
- Grid
- 12 kV, 4 kV to 3000 Energy Corp
- Location
- North Slope County, Alaska
- Operated by
- TDX North Slope Generating Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 34 years since 1992
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 246 |
| Net generation (MWh), 2025 | -300 |
Data notes (2)
- Capacity factor, 2025 not shown: net generation -300.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
- Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 0.6 MW
- Generators retired
- 1
- Capacity still in service
- 7.8 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 12 | Natural Gas Internal Combustion Engine | 0.6 MW | Retired | January 2012 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV, 4 kV
- Transmission or distribution system owner
- 3000 Energy Corp
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 12 scheduled to retire, 0.6 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory