TNSG South Plant — Power plant · Gas, reciprocating engine · TDX North Slope Generating Inc.
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

TNSG South Plant

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1992
Net generation, 2025
-300 MWh
Grid
12 kV, 4 kV to 3000 Energy Corp
Location
North Slope County, Alaska
Operated by
TDX North Slope Generating Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2025
Fuel burned MMBtu by year, 2012 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
34 years since 1992
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025246
Net generation (MWh), 2025-300
Data notes (2)
  • Capacity factor, 2025 not shown: net generation -300.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
  • Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
0.6 MW
Generators retired
1
Capacity still in service
7.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
12Natural Gas Internal Combustion Engine0.6 MWRetiredJanuary 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV, 4 kV
Transmission or distribution system owner
3000 Energy Corp
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 12 scheduled to retire, 0.6 MW · EIA-860M
  • In service · EIA-860M