Show on map
Triton East and West Cogen — Power plant · Gas, reciprocating engine · Triton CollegeDIGITAL GRAND AVENUE 3 LLC — Built · Large load · IL · 1.0 mi awayDLR 9311 (Franklin Park data centre) — Filed · Large load · IL · 1.1 mi awayFRANKLIN PARK (CHI22) DATA CENTER — Built · Large load · IL · 1.1 mi awayW Belmont Ave — Under construction · Solar · IL · 1.4 MW · 1.5 mi awayFranklin Park 2-SLCHI802 — Under construction · Solar · IL · 1.2 MW · 2.2 mi awayNorthlake 2-SLCHI302 — Under construction · Solar · IL · 1.6 MW · 3.2 mi awayNorthlake 3-SLCHI303 — Under construction · Solar · IL · 1.6 MW · 3.3 mi awayNALCO WATER — Built · Large load · IL · 3.4 mi awayNorthlake 4-SLCHI304 — Under construction · Solar · IL · 1.4 MW · 3.7 mi awayNorthlake 5-SLCHI305 — Under construction · Solar · IL · 2.5 MW · 3.8 mi awayAligned (Northlake data centre) — Built · Large load · IL · 3.8 mi awayT5@CHICAGO III LP — Built · Large load · IL · 3.8 mi awayT5 Data Center Northlake — Filed · Large load · IL · 3.8 mi awayMICROSOFT CORP-CHICAGO DATA CENTER — Built · Large load · IL · 3.9 mi awayCopenhagen Ct — Under construction · Solar · IL · 3.5 MW · 4.0 mi awayMelrose Park 2-SLCHI547 — Under construction · Solar · IL · 3 MW · 4.5 mi awayCicero 3-SLCHI603 — Under construction · Solar · IL · 1.9 MW · 5.8 mi awayBensenville 2-SLCHI526 — Under construction · Solar · IL · 1.9 MW · 6.7 mi awayBensenville 14-SLCHI414 — Under construction · Solar · IL · 1.3 MW · 6.9 mi awayBensenville Ind Park 10-SLCHI410 — Under construction · Solar · IL · 1.2 MW · 7.0 mi awayCLEARBLUE TECHNOLOGIES/OAKBROOK INC — Built · Large load · IL · 7.0 mi awayBensenville Ind Park 11 — Under construction · Solar · IL · 1.2 MW · 7.0 mi awayBensenville Ind Park 6-SLCHI406 — Postponed · Solar · IL · 1.1 MW · 7.0 mi awayBensenville Ind Park 4-SLCHI424 — Under construction · Solar · IL · 1.7 MW · 7.2 mi awayBensenville Ind Park 2-SLCHI402 — Under construction · Solar · IL · 1.1 MW · 7.2 mi awayBensenville Ind Park 12-SLCHI412 — Postponed · Solar · IL · 1.1 MW · 7.3 mi awayCyrus One V3 Point 1 — Under construction · Large load · IL · 7.3 mi awayCHICAGO ENTERPRISE LLC — Built · Large load · IL · 7.4 mi awayBensenville 13-SLCHI513 — Under construction · Solar · IL · 1.4 MW · 7.4 mi awayDes Plaines 11-SLCHI211 — Under construction · Solar · IL · 1.6 MW · 7.7 mi awayLP27 (Elk Grove data centre) — Filed · Large load · IL · 7.7 mi awayMobile Crane - Unit (Chicago data centre) — Filed · Large load · IL · 7.8 mi away2425 BUSSE ROAD LLC — Built · Large load · IL · 7.8 mi awayEDGECONNEX — Large load · IL · 7.9 mi awayMcCook 2-SLCHI102 — Under construction · Solar · IL · 2 MW · 8.0 mi awayELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER — Built · Large load · IL · 8.0 mi awaySTREAM DATA CENTERS — Built · Large load · IL · 8.0 mi awayEquinix CH5 Chiller — Built · Large load · IL · 8.0 mi awayEQUINIX CH-5 DATA CENTER — Built · Large load · IL · 8.1 mi awayDIPPER VENTURES LLC CH3 DATA CENTER — Built · Large load · IL · 8.1 mi awayElk Grove 51-SLCHI151 — Under construction · Solar · IL · 1.4 MW · 8.2 mi awayELK GROVE DATA CENTER LLC — Large load · IL · 8.5 mi awaySTREAM DATA CENTERS ORDC CAMPUS — Built · Large load · IL · 8.5 mi awayElk Grove 1-SLCHI701 — Under construction · Solar · IL · 1.7 MW · 8.7 mi awayData Center 901 Busse Road Elk Grove — Filed · Large load · IL · 8.7 mi awayEDGECONNEX — Built · Large load · IL · 8.9 mi awayPrime Data Center — Built · Large load · IL · 9.4 mi awayNTT Data Centers — Built · Large load · IL · 9.6 mi away360 TCS LLC — Built · Large load · IL · 9.7 mi awayCLOUD HQ DATA CENTER — Built · Large load · IL · 9.7 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Triton East and West Cogen

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1998
Net generation, 2025
362 MWh
Grid
4 kV, 0.5 kV to Commonwealth Edison Co (PJM)
Location
Cook County, Illinois
Operated by
Triton CollegeSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2026
Fuel burned MMBtu by year, 2013 to 2026
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
28 years since 1998
Unused energy
31 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
4.20, 0.500
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20251,112
Capacity factor, 20250.011
Net generation (MWh), 2025362
Balancing authority codePJM
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 3071.8 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DIGITAL GRAND AVENUE 3 LLC Built Large load 1.0 mi
DLR 9311 (Franklin Park data centre) Filed Large load 1.1 mi
FRANKLIN PARK (CHI22) DATA CENTER Built Large load 1.1 mi
W Belmont Ave Under construction Solar 1.5 mi 1.4
Franklin Park 2-SLCHI802 Under construction Solar 2.2 mi 1.2
Northlake 2-SLCHI302 Under construction Solar 3.2 mi 1.6
Northlake 3-SLCHI303 Under construction Solar 3.3 mi 1.6
NALCO WATER Built Large load 3.4 mi
Northlake 4-SLCHI304 Under construction Solar 3.7 mi 1.4
Northlake 5-SLCHI305 Under construction Solar 3.8 mi 2.5
Aligned (Northlake data centre) Built Large load 3.8 mi
T5@CHICAGO III LP Built Large load 3.8 mi
T5 Data Center Northlake Filed Large load 3.8 mi
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 3.9 mi
Copenhagen Ct Under construction Solar 4.0 mi 3.5
Melrose Park 2-SLCHI547 Under construction Solar 4.5 mi 3
Cicero 3-SLCHI603 Under construction Solar 5.8 mi 1.9
Bensenville 2-SLCHI526 Under construction Solar 6.7 mi 1.9
Bensenville 14-SLCHI414 Under construction Solar 6.9 mi 1.3
Bensenville Ind Park 10-SLCHI410 Under construction Solar 7.0 mi 1.2
CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built Large load 7.0 mi
Bensenville Ind Park 11 Under construction Solar 7.0 mi 1.2
Bensenville Ind Park 6-SLCHI406 Postponed Solar 7.0 mi 1.1
Bensenville Ind Park 4-SLCHI424 Under construction Solar 7.2 mi 1.7
Bensenville Ind Park 2-SLCHI402 Under construction Solar 7.2 mi 1.1
Bensenville Ind Park 12-SLCHI412 Postponed Solar 7.3 mi 1.1
Cyrus One V3 Point 1 Under construction Large load 7.3 mi
CHICAGO ENTERPRISE LLC Built Large load 7.4 mi
Bensenville 13-SLCHI513 Under construction Solar 7.4 mi 1.4
Des Plaines 11-SLCHI211 Under construction Solar 7.7 mi 1.6
LP27 (Elk Grove data centre) Filed Large load 7.7 mi
Mobile Crane - Unit (Chicago data centre) Filed Large load 7.8 mi
2425 BUSSE ROAD LLC Built Large load 7.8 mi
EDGECONNEX × 2 units Unknown Large load 7.9 mi
McCook 2-SLCHI102 Under construction Solar 8.0 mi 2
ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built Large load 8.0 mi
STREAM DATA CENTERS Built Large load 8.0 mi
Equinix CH5 Chiller Built Large load 8.0 mi
EQUINIX CH-5 DATA CENTER Built Large load 8.1 mi
DIPPER VENTURES LLC CH3 DATA CENTER Built Large load 8.1 mi
Elk Grove 51-SLCHI151 Under construction Solar 8.2 mi 1.4
ELK GROVE DATA CENTER LLC Unknown Large load 8.5 mi
STREAM DATA CENTERS ORDC CAMPUS Built Large load 8.5 mi
Elk Grove 1-SLCHI701 Under construction Solar 8.7 mi 1.7
Data Center 901 Busse Road Elk Grove Filed Large load 8.7 mi
Prime Data Center Built Large load 9.4 mi
NTT Data Centers Built Large load 9.6 mi
360 TCS LLC Built Large load 9.7 mi
CLOUD HQ DATA CENTER Built Large load 9.7 mi

Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · EPA ICIS-NPDES

Sources

Attribution