Show on map
U S Alliance Coosa Pines — Power plant · Biomass · Bowater Newport Coosa Pines OpCHILDERSBURG DATA CENTER — Under construction · Large load · AL · 1.8 mi away
  • Bioenergy
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

U S Alliance Coosa Pines

Power plant · Biomass

Key facts

Power plant · Biomassran 53% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2025
119,707 MWh
Grid
110 kV to Alabama Power Co (SOCO)
Location
Talladega County, Alabama

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
19 years since 2007
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Paper Excellence BV
Share pct
100
Gem entity id
E100002000600
Unit ids
G100001054376
Location id
L100001047716
Eia plant ids
54216
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110056955166
Subparts reported
AA, C, TT
NAICS code
322110
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000305
Fuel burned (MMBtu), 20258,396,369
Capacity factor, 20250.528
Net generation (MWh), 2025119,707
Balancing authority codeSOCO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 70141.0 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
37.5 MW
Generators retired
6
Capacity still in service
25.9 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
AOW3Conventional Steam Coal5 MWRetiredJanuary 2003
AOW1Conventional Steam Coal5 MWRetiredNovember 2008
AOW2Conventional Steam Coal5 MWRetiredNovember 2008
AOW4Conventional Steam Coal5 MWRetiredNovember 2008
AOW5Conventional Steam Coal5 MWRetiredNovember 2008
AOW6Natural Gas Steam Turbine12.5 MWRetiredJanuary 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal25 MW
Natural Gas Steam Turbine12.5 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
110 kV
Transmission or distribution system owner
Alabama Power Co
Balancing authority
Southern Company Services, Inc. - Trans
NERC region
SERC
Transmission lines within 15 mi (6)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
RESOLUTE FP US INC Owner 100.0% Dec 31, 2023 EPA GHGRP
Bowater Newport Coosa Pines Op Operator EIA-860M

Timeline

  • Stated Unit AOW6 scheduled to retire, 12.5 MW · EIA-860M
  • Stated Units AOW1, AOW2, AOW4, AOW5 scheduled to retire, 20 MW · EIA-860M
  • In service · EIA-860M
  • Stated Unit AOW3 scheduled to retire, 5 MW · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CHILDERSBURG DATA CENTER Under construction Large load 1.8 mi

Sources EPA ICIS-NPDES

Sources

Attribution