UNH 7.9 MW Plant
- Wind & solar
- Bioenergy
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Bioenergy
- Loads
- In development
- Operating
- Size not stated
UNH 7.9 MW Plant: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
UNH 7.9 MW Plant
Power plant · Biomass
Key facts
Power plant · Biomassran 78% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2025
- 53,927 MWh
- Grid
- 34 kV to Public Service Co of NH (ISNE)
- Location
- Strafford County, New Hampshire
- Operated by
- Emcor Energy Services
Output
- Gas
- Oil
- Biomass and waste
Details
Who’s behind it
Book a call
About these actionsWatch: follow it in your Deal room and on the map. Book a call: our team gets you what you need.
- Technology
- Biomass source: “Landfill Gas”
- Age
- 20 years since 2006
- Heat rate
- 12,998 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 700,933 |
| Capacity factor, 2025 | 0.779 |
| Heat rate (Btu/kWh), 2025 | 12,997.8 |
| Net generation (MWh), 2025 | 53,927 |
| Balancing authority code | ISNE |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Emcor Energy Services | Operator | EIA-860M |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| LIBERTY MUTUAL DATA CENTER Built | Large load | 8.9 mi | |
| Freedom Pine Solar Announced | Solar | 14.7 mi | 250 |
Sources EPA ICIS-Air · EIA-860M