- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Vansycle II Wind Energy Center: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Vansycle II Wind Energy Center
Power plant · Wind
Key facts
Power plant · Windran 36% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2009
- Net generation, 2025
- 320,128 MWh
- Grid
- 230 kV to PacifiCorp (PACW)
- Location
- Umatilla County, Oregon
- Operated by
- FPL Energy Stateline II IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 320,128
MWh - Fuel burned, 2025
- 1,092,276
MMBtu - Capacity factor, 2025
- 35.7
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 320,128 | 1,092,276 | 35.7% | — |
| 2024 | 357,311 | 1,219,145 | 39.8% | — |
| 2023 | 329,169 | 1,123,124 | 36.7% | — |
| 2022 | 182,065 | 621,206 | 20.3% | — |
| 2021 | 303,659 | 2,685,559 | 33.9% | — |
| 2020 | 310,808 | 2,724,854 | 34.6% | — |
| 2019 | 206,147 | 1,835,740 | 23.0% | — |
| 2018 | 280,087 | 2,549,912 | 31.2% | — |
| 2017 | 206,549 | 1,902,936 | 23.1% | — |
| 2016 | 262,620 | 2,424,509 | 29.2% | — |
| 2015 | 227,249 | 2,117,734 | 25.4% | — |
| 2014 | 282,452 | 2,686,120 | 31.5% | — |
| 2013 | 259,186 | 2,472,894 | 28.9% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.