Wellford Renewable Energy Plant
- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Wellford Renewable Energy Plant: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Wellford Renewable Energy Plant
Power plant · Biomass
Key facts
Power plant · Biomassran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 59 MWh
- Grid
- 12 kV to Duke Energy Carolinas, LLC (DUK)
- Location
- Spartanburg County, South Carolina
- Operated by
- Lockhart Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Biomass source: “Landfill Gas”
- Age
- 15 years since 2011
- Heat rate
- 13,170 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 777 |
| Capacity factor, 2025 | 0.004 |
| Heat rate (Btu/kWh), 2025 | 13,169.5 |
| Net generation (MWh), 2025 | 59 |
| Balancing authority code | DUK |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Highway 9 Solar Postponed | Solar | 9.5 mi | 2 |
| Davis Road Solar Postponed | Solar | 10.8 mi | 2 |
| Fairview Solar Postponed | Solar | 11.2 mi | 2 |
Sources EIA-860M