Show on map
Wellford Renewable Energy Plant — Power plant · Biomass · Lockhart Power CoHighway 9 Solar — Postponed · Solar · SC · 2 MW · 9.5 mi awayDavis Road Solar — Postponed · Solar · SC · 2 MW · 10.8 mi awayFairview Solar — Postponed · Solar · SC · 2 MW · 11.2 mi away
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Wellford Renewable Energy Plant

Power plant · Biomass

Key facts

Power plant · Biomassran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
59 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Spartanburg County, South Carolina
Operated by
Lockhart Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2025
Fuel burned MMBtu by year, 2011 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Landfill Gas”
Age
15 years since 2011
Heat rate
13,170 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 2025777
Capacity factor, 20250.004
Heat rate (Btu/kWh), 202513,169.5
Net generation (MWh), 202559
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Highway 9 Solar Postponed Solar 9.5 mi 2
Davis Road Solar Postponed Solar 10.8 mi 2
Fairview Solar Postponed Solar 11.2 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution