Show on map
West Rutland - Coolidge 345 kV — Transmission lineFair Haven Solar — Permitted · Solar · VT · 20 MW · 11.1 mi awayBeaver Wood Energy Fair Haven, LLC — Postponed · Biomass · VT · 34 MW · 12.1 mi awayClaremont Solar — Postponed · Solar · NH · 20 MW · 14.8 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

West Rutland - Coolidge 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-VT
Owner (as stated)
Vermont Electric Power

Details

Who’s behind it

Owner
Vermont Electric Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
27
Substations at the ends (as the source names them)
West Rutland to Coolidge
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvermont electric power
HIFLD line ID150549
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Fair Haven Solar Permitted Solar 11.1 mi 20
Beaver Wood Energy Fair Haven, LLC Postponed Biomass 12.1 mi 34
Claremont Solar Postponed Solar 14.8 mi 20

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution