Show on map
Xinjiang Jimsar Xinfeng solar farm — Power plant · Solar · Jimsar Xinfeng New EnergyBeisantai Industrial Park power station Phase II Unit 3 — Canceled · Coal · China · 150 MW · 8.7 km awayBeisantai Industrial Park power station Phase II Unit 4 — Canceled · Coal · China · 150 MW · 8.7 km awayBeisantai Industrial Park power station Phase I Unit 1 — Canceled · Coal · China · 150 MW · 8.7 km awayBeisantai Industrial Park power station Phase I Unit 2 — Canceled · Coal · China · 150 MW · 8.7 km away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Xinjiang Jimsar Xinfeng solar farm

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2016
Location
Xinjiang, China

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “utility-scale solar / PV”
Age
10 years since 2016
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Owners
Name
Xinjiang Lixin Energy Co Ltd
Share pct
100
Unit ids
G100000813888
Location id
L100000811399
Subnational
Xinjiang
Unit statuses
Operating
1
Location accuracy
approximate

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareSource
Jimsar Xinfeng New Energy Operator GEM
Xinjiang Lixin Energy Co Ltd Owner 100.0% GEM

Timeline

  • In service · GEM

Sources

2 sources

Sources GEM · Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Beisantai Industrial Park power station Phase II Unit 3 Canceled Coal 8.7 km 150
Beisantai Industrial Park power station Phase II Unit 4 Canceled Coal 8.7 km 150
Beisantai Industrial Park power station Phase I Unit 1 Canceled Coal 8.7 km 150
Beisantai Industrial Park power station Phase I Unit 2 Canceled Coal 8.7 km 150

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution