Çelikler Yatırım Holding AŞ
- Combustion
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
- Other companies nearby
3 assets
3 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 1 project: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
Power plant owner
- Companies below
- 2
- Registered in
- Türkiye
On the map, by stage
On the map, by stage
| Stage | Sites | GW | No MW |
|---|---|---|---|
| Planned | 0 | 0 | 0 |
| Under construction | 0 | 0 | 0 |
| Operating | 3 | 1.2 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Projects 1
Capacity
300 MW
none active
- Withdrawn or canceled: 300 MW, 1 project
Including subsidiaries
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Company | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|---|
| Canceled | Tunçbilek power station Expansion | Coal | 300 MW | Türkiye | Çelikler Orhaneli Tunçbilek Elektrik Üretim AŞ | — | Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) |
Sources GEM
Assets 3
Assets
3
Capacity
1.2 GW
- Coal: 1.2 GW, 3 assets
Owns 3 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Seyitömer power station | Coal | Owns | 600 MW | — | 100.0% | Çelikler Seyitömer Elektrik Üretim AŞ |
| Tunçbilek power station | Coal | Owns | 365 MW | — | 100.0% | Çelikler Orhaneli Tunçbilek Elektrik Üretim AŞ |
| Orhaneli power station | Coal | Owns | 210 MW | — | 100.0% | Çelikler Orhaneli Tunçbilek Elektrik Üretim AŞ |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 2
Companies
2
Parents
0
Subsidiaries
2
direct
Holding assets
2
of 3 companies in the group
-
Çelikler Yatırım Holding AŞ This company 3 assets1,175 MWwith the companies below
-
Çelikler Orhaneli Tunçbilek Elektrik Üretim AŞ Subsidiary · share not stated 2 assets575 MW
-
Çelikler Seyitömer Elektrik Üretim AŞ Subsidiary · share not stated 1 asset600 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Çelikler Orhaneli Tunçbilek Elektrik Üretim AŞ | Subsidiary | 2 | power plant |
| Çelikler Seyitömer Elektrik Üretim AŞ | Subsidiary | 1 | power plant |
Sources 1
Registers
1
Reuse terms
- 1 Open license, with credit
Latest read
2026-10-26
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 3
within 25 kmProjects
3
within 25 km
Nearest
2.2 km
Polat power station Unit 2
All 3NearbyShowing all 3 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Canceled | Polat power station Unit 2 | Coal | 300 MW | 2.2 km away | nearest: Tunçbilek power station |
| Announced | Kirgilli solar project -- | Solar | 13.7 MW | 18.9 km away | nearest: Seyitömer power station |
| Announced | Kutahya solar project -- | Solar | 13.7 MW | 19.2 km away | nearest: Seyitömer power station |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.