Mata De Palma Washington Solar Park — Power plant · Solar · Gamesa Electric; WCGF Solar; Energia Renovable BASZephyr wind farm — Power plant · Wind · Gamesa ElectricLakeside Energy wind farm — Power plant · Wind · Gamesa ElectricCacho wind farm -- — Announced · Wind · Pakistan · 50 MW · 5.5 km awayChina Sunec wind farm -- — Canceled · Wind · Pakistan · 50 MW · 14.0 km awayBin Qasim power station Phase 1 Repower Project Unit 3 — Canceled · Coal · Pakistan · 210 MW · 14.8 km awayBin Qasim power station Phase 1 Repower Project Unit 4 — Canceled · Coal · Pakistan · 210 MW · 14.8 km awayMirasol solar farm -- — Under construction · Solar · Dominican Republic · 100 MW · 15.7 km awayArabian Sea wind farm -- — Canceled · Wind · Pakistan · 50 MW · 23.2 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
3
Registered in
United States

Projects 1

Capacity

0.10 GW

none active

GW by stage
  1. Withdrawn or canceled: 0.10 GW, 1 project

Sources GEM

Sources

  • GEM1 projectretrieved Oct 26, 2026

Every source and license · Attribution

Around this company

Nearby 6

within 25 km

Projects

6

within 25 km

Nearest

5.5 km

Cacho wind farm --

All 6NearbyShowing all 6 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Cacho wind farm -- Wind 50 MW 5.5 km away nearest: Lakeside Energy wind farm
Canceled China Sunec wind farm -- Wind 50 MW 14.0 km away nearest: Lakeside Energy wind farm
Canceled Bin Qasim power station Phase 1 Repower Project Unit 3 Coal 210 MW 14.8 km away nearest: Zephyr wind farm
Canceled Bin Qasim power station Phase 1 Repower Project Unit 4 Coal 210 MW 14.8 km away nearest: Zephyr wind farm
Under construction Mirasol solar farm -- Solar 100 MW 15.7 km away nearest: Mata De Palma Washington Solar Park
Canceled Arabian Sea wind farm -- Wind 50 MW 23.2 km away nearest: Zephyr wind farm

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution