- Combustion
- Wind & solar
- Bioenergy
- In development
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Bioenergy
- In development
- Operating
- Other companies nearby
11 assets · 3 projects
11 assets · 3 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 12 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
1 outside this view, drawn where they are: zoom out to see it.
Power plant owner
- Capacity held
- 4,165MW
- Assets
- 11
- Companies below
- 3
- Headquarters
- Shenzhen, China Source: Wikidata
- Website
- sec.com.cn Source: Wikidata
- Listed
- Shenzhen Stock Exchange: 000027 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
Projects 15
Capacity
9.61 GW
9.21 GW active
- Announced: 9.11 GW, 12 projects
- In process: 0.10 GW, 1 project
- Withdrawn or canceled: 0.40 GW, 2 projects
Sources GEM
Assets 11
Assets
11
Capacity
4,165 MW
- Gas, combined cycle: 2,390 MW, 1 asset
- Wind: 1,036 MW, 4 assets
- Biomass: 379 MW, 2 assets
- Solar: 360 MW, 4 assets
Operates 1 power plant · Owns 11 power plants
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 4
Companies
4
this one included
Parents
0
Subsidiaries
3
direct
Assets are what each company holds itself. A dash: this view does not show it; the company’s own page does.
-
Shenzhen Energy Group Co Ltd This company 15 assets6,545 MWwith the companies below
-
Chaozhou Shenneng Ganlu Thermal Power Co Ltd Subsidiary · share not stated 2 assets400 MW
-
Huizhou Shenneng Fengda Power Co Ltd Subsidiary · share not stated 1 asset1,280 MW
-
Shenneng Baoding Power Generation Co Ltd Subsidiary · share not stated 1 asset700 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Shenzhen Energy Group Co Ltd | This company | 11 | power plant |
| Chaozhou Shenneng Ganlu Thermal Power Co Ltd | Subsidiary | — | — |
| Huizhou Shenneng Fengda Power Co Ltd | Subsidiary | — | — |
| Shenneng Baoding Power Generation Co Ltd | Subsidiary | — | — |
Sources 2
Registers
2
Reuse terms
- 1 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 19
within 25 kmProjects
19
within 25 km
Nearest
0.0 km
Shenzhen Energy East power station 3-2
All 19NearbyShowing all 19 nearby projects.
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.