CA Riverside 2356 Fleetwood Dr.
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Riverside County, California
Sources
-
View at source →
EIA-860M · 2 records (66511-18262, 66511-B8262)
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Units and requests (2)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| EIA-860M Generator | 66511-18262 | CA Riverside 2356 Fleetwood Dr. | Solar | 2 | Under construction “(V) Under construction, more than 50 percent complete” | Nov 1, 2026 |
| EIA-860M Generator | 66511-B8262 | CA Riverside 2356 Fleetwood Dr. | Storage | 2 | Under construction “(V) Under construction, more than 50 percent complete” | Nov 1, 2026 |