Show on map
Cairn Duhie Wind FarmOurack Wind Farm — Permitted · Wind + storage · 105 MW · 8.2 km awayLethen Wind Farm — Filed · Wind · 114 MW · 8.4 km awayClash Gour — Studied · Wind + storage · 210 MW · 10.5 km awayBerry Burn Wind Farm — Built · Wind · 67 MW · 13.9 km awayBalnespick Wind Farm — Filed · Wind + storage · 58 MW · 17.1 km awayMeikle Hill wind farm -- — Wind · 13.8 MW · 19.0 km awayClune Wind Farm — Filed · Wind + storage · 187.2 MW · 22.4 km awayKellas Wind Farm — Filed · Wind · 90 MW · 22.4 km awayFarr Wind Farm - Tomatin — Built · Wind · 92 MW · 23.3 km awayRothes wind farm 3 — Announced · Wind · 132 MW · 23.7 km awayDaviot Windfarm BEGA — Filed · Wind + storage · 45 MW · 24.9 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Cairn Duhie Wind Farm

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Queue position
PRO-001743
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Wind source: “Wind Onshore”
Capacity (MW)
67.2 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 67.2 MW nameplate.
Connects at
Berryburn 275/33kV GSP SubstationConnection point160.3 MW active (3 of 3 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as permitted in NESO (source status: “Consents Approved”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 25, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Ourack Wind Farm Permitted Wind + storage 8.2 km 105
Lethen Wind Farm Filed Wind 8.4 km 114
Clash Gour Studied Wind + storage 10.5 km 210
Berry Burn Wind Farm Built Wind 13.9 km 67
Balnespick Wind Farm Filed Wind + storage 17.1 km 58
Meikle Hill wind farm -- Unknown Wind 19.0 km 13.8
Clune Wind Farm Filed Wind + storage 22.4 km 187.2
Kellas Wind Farm Filed Wind 22.4 km 90
Farr Wind Farm - Tomatin Built Wind 23.3 km 92
Rothes wind farm 3 Announced Wind 23.7 km 132
Daviot Windfarm BEGA Filed Wind + storage 24.9 km 45

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 25, 2026Supported by National Energy SO Open Data

Attribution