Dyce Energy Storage Facility

overdue by 8 months (target Mar 31, 2026)

Storage

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001822
In-service date
(stated)
Location
Dyce 132/33kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Storage source: “Energy Storage System”
Connects at
Dyce 132/33kV GSPConnection point95.6 MW active (3 of 3 projects).

Timeline

  • Observed as studied in NESO (source status: “Awaiting Consents”).
  • First published from NESO Transmission Entry Capacity (TEC) Register.
  • Stated In-service date stated by NESO. Passed 8 months ago; NESO still says studied.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 25, 2026Supported by National Energy SO Open Data