No site point
Map
Location: Elvanfoot 400/275/33kV, United Kingdom (no site point).
Elvanfoot (9.8 MW) Energy Storage
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001721
- In-service date
- (stated)
- Location
- Elvanfoot 400/275/33kV, United Kingdom
Details
Who’s behind it
- Developer
- Elvanfoot Energy Storage Limited
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Energy Storage System”
- Connects at
- Elvanfoot 400/275/33kVConnection point9.8 MW active (1 of 1 projects).
Timeline
- Stated In-service date stated by NESO.
- Observed as permitted in NESO (source status: “Consents Approved”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data