Evans Creek Energy Storage Project
Storage
Key facts
Storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0260
- In-service date
- (stated)
- Location
- Val Verde County, Texas
Details
Who’s behind it
- Developer
- Evans Creek Energy Storage LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Other - Battery Energy Storage”
- Capacity (MW)
- 103 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 103 MW nameplate.
- Connects at
- Comstock 138kV Substation (PSSE Bus #8683)Connection point103 MW active (1 of 1 projects).
- EIA plant
- 68334 generator EVCRK
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- First published from EIA-860M Preliminary Monthly Electric Generator Inventory.
- Stated In-service date stated by EIA-860M.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.