Ford Oaks Solar & Green Infrastructure Facility --
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
Ford Oaks Solar & Green Infrastructure Facility --: the source's site coordinate and 13 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ford Oaks Solar & Green Infrastructure Facility --
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- England, United Kingdom
Details
Who’s behind it
- Developer
- Taiyo Power & Storage Ltd
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Rockbeare Hill solar farm -- Announced | Solar | 1.3 km | 15 |
| Higher Hawkerland Farm Sidmouth Road solar farm -- Announced | Solar | 3.4 km | 18 |
| Westexe Greendale Business Park solar project -- Announced | Solar | 4.5 km | 1.1 |
| Kerswell Barton Farm Broadclyst solar project -- Announced | Solar | 6.6 km | 16.2 |
| Winslade Park solar project -- Announced | Solar | 6.9 km | 1.9 |
| Winham Farm solar farm 2 Announced | Solar | 10.7 km | 5 |
| Belle Vue Road solar project -- Announced | Solar | 12.4 km | 1.1 |
| Bowhay Farm solar farm -- Canceled | Solar | 15.4 km | 10.7 |
| Nether Mill Farm solar farm 2 Announced | Solar | 18.7 km | 3.1 |
| Broad Path solar project -- Announced | Solar | 20.4 km | 4.3 |
| Carland Cross wind farm 1 Canceled | Wind | 20.9 km | 4.1 |
| Dunscombe Solar -- Postponed | Solar | 22.3 km | 5 |
| Higher Humber Farm solar project -- Postponed | Solar | 24.1 km | 5.9 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.