Show on map
Fordmouth solar project --Crofthill wind farm -- — Canceled · Wind · 17 MW · 1.6 km awayCalla wind farm -- — Canceled · Wind · 18 MW · 1.9 km awayHeathland Wind Farm — Filed · Wind + storage · 80 MW · 6.0 km awayWoolfords Farm - Onshore wind farm -- — Announced · Wind · 19.8 MW · 6.8 km awayTormywheel wind farm 2 — Announced · Wind · 5 MW · 7.7 km awayGladsmuir Wind Farm — Filed · Wind · 43 MW · 8.1 km awayMillour Hill Community wind farm 1 — Canceled · Wind · 28 MW · 8.4 km awayPearie Law wind farm 2 — Announced · Wind · 14.4 MW · 10.1 km awayLand South East Of Auchterhead wind farm -- — Announced · Wind · 2.3 MW · 10.9 km awayCamilty wind farm -- — Announced · Wind · 25.8 MW · 11.2 km awayFauch Hill (European Forest Resources Group) wind farm -- — Canceled · Wind · 69 MW · 11.6 km awayStarryshaw wind farm -- — Canceled · Wind · 12 MW · 13.0 km awayShotts wind farm -- — Postponed · Wind · 18 MW · 14.4 km awayBenhar wind farm -- — Postponed · Wind · 15 MW · 14.9 km awayHartwood (ABO Wind UK) wind farm -- — Postponed · Wind · 21 MW · 15.7 km awaySouthrigg 2 I wind farm -- — Announced · Wind · 1.5 MW · 15.9 km awaySouthrigg 2 II wind farm -- — Announced · Wind · 4.2 MW · 16.0 km awayRoundhill Sewage Works Wind Turbines -- — Canceled · Wind · 1.5 MW · 16.4 km awaySouthrigg 3 wind farm -- — Announced · Wind · 4.2 MW · 17.3 km awayForrest Road, Salsburgh wind farm -- — Announced · Wind · 9 MW · 17.6 km awayHeights Road, Blackridge - Woodend wind farm -- — Announced · Wind · 19.8 MW · 18.3 km awayBroken Cross Windfarm — Built · Wind · 48 MW · 19.4 km awaySelms Muir solar farm -- — Announced · Solar · 18 MW · 19.4 km awayForrestfield wind farm -- — Announced · Wind · 13.2 MW · 19.4 km awayRogerhill Battery Energy Storage System & solar farm -- — Announced · Solar · 100 MW · 19.8 km awayThe Wyman Gordon Facility Nettlehill Road solar farm -- — Announced · Solar · 2 MW · 20.3 km awayDraffanmarshill Farm wind farm -- — Announced · Wind · 4.2 MW · 20.3 km awayDrumelzie wind farm -- — Postponed · Wind · 1.5 MW · 20.4 km awayNettlehill Road solar project -- — Announced · Solar · 2.8 MW · 20.5 km awayDrumduff wind farm 2 — Announced · Wind · 15 MW · 20.6 km awayCentral Eco Park solar farm -- — Announced · Solar · 12 MW · 20.7 km awayHag Law wind farm -- — Postponed · Wind · 20 MW · 21.0 km awayNether Braco Farm wind farm -- — Canceled · Wind · 21 MW · 21.1 km awayBrewster Brothers Drumshoreland Road solar project -- — Announced · Solar · 1.7 MW · 21.3 km awayBrakes Edinburgh Road solar project -- — Announced · Solar · 1.4 MW · 22.1 km awaySmeath Road Wind Turbines -- — Canceled · Wind · 9 MW · 22.3 km awayGrayside Wind Farm — Filed · Wind · 108 MW · 22.6 km awayCloich Forest Wind Farm — Filed · Wind · 67.2 MW · 22.7 km awayLimmer Hill wind farm -- — Canceled · Wind · 99 MW · 22.8 km awayKittymuir Farm wind farm -- — Postponed · Wind · 1.6 MW · 22.9 km awayHigh Blackwoodyards Farm wind farm -- — Postponed · Wind · 2 MW · 23.0 km awayEaster Drumclair Wood wind farm 1 — Announced · Wind · 4 MW · 23.6 km awayEaster Drumclair Wood wind farm 2 — Announced · Wind · 4 MW · 23.6 km awayEaster Drumclair Wood wind farm 3 — Announced · Wind · 4 MW · 23.6 km awayEaster Drumclair Wood wind farm 4 — Announced · Wind · 6 MW · 23.6 km awayKilrubie wind farm -- — Canceled · Wind · 21 MW · 24.0 km awayBrew Dog Brewery Condor Glen solar project -- — Announced · Solar · 1.3 MW · 24.5 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Fordmouth solar project --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Scotland, United Kingdom

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as postponed in GEM (source status: “shelved”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Crofthill wind farm -- Canceled Wind 1.6 km 17
Calla wind farm -- Canceled Wind 1.9 km 18
Heathland Wind Farm Filed Wind + storage 6.0 km 80
Woolfords Farm - Onshore wind farm -- Announced Wind 6.8 km 19.8
Tormywheel wind farm 2 Announced Wind 7.7 km 5
Gladsmuir Wind Farm Filed Wind 8.1 km 43
Millour Hill Community wind farm 1 Canceled Wind 8.4 km 28
Pearie Law wind farm 2 Announced Wind 10.1 km 14.4
Land South East Of Auchterhead wind farm -- Announced Wind 10.9 km 2.3
Camilty wind farm -- Announced Wind 11.2 km 25.8
Fauch Hill (European Forest Resources Group) wind farm -- Canceled Wind 11.6 km 69
Starryshaw wind farm -- Canceled Wind 13.0 km 12
Shotts wind farm -- Postponed Wind 14.4 km 18
Benhar wind farm -- Postponed Wind 14.9 km 15
Hartwood (ABO Wind UK) wind farm -- Postponed Wind 15.7 km 21
Southrigg 2 I wind farm -- Announced Wind 15.9 km 1.5
Southrigg 2 II wind farm -- Announced Wind 16.0 km 4.2
Roundhill Sewage Works Wind Turbines -- Canceled Wind 16.4 km 1.5
Southrigg 3 wind farm -- Announced Wind 17.3 km 4.2
Forrest Road, Salsburgh wind farm -- Announced Wind 17.6 km 9
Heights Road, Blackridge - Woodend wind farm -- Announced Wind 18.3 km 19.8
Broken Cross Windfarm Built Wind 19.4 km 48
Selms Muir solar farm -- Announced Solar 19.4 km 18
Forrestfield wind farm -- Announced Wind 19.4 km 13.2
Rogerhill Battery Energy Storage System & solar farm -- Announced Solar 19.8 km 100
The Wyman Gordon Facility Nettlehill Road solar farm -- Announced Solar 20.3 km 2
Draffanmarshill Farm wind farm -- Announced Wind 20.3 km 4.2
Drumelzie wind farm -- Postponed Wind 20.4 km 1.5
Nettlehill Road solar project -- Announced Solar 20.5 km 2.8
Drumduff wind farm 2 Announced Wind 20.6 km 15
Central Eco Park solar farm -- Announced Solar 20.7 km 12
Hag Law wind farm -- Postponed Wind 21.0 km 20
Nether Braco Farm wind farm -- Canceled Wind 21.1 km 21
Brewster Brothers Drumshoreland Road solar project -- Announced Solar 21.3 km 1.7
Brakes Edinburgh Road solar project -- Announced Solar 22.1 km 1.4
Smeath Road Wind Turbines -- Canceled Wind 22.3 km 9
Grayside Wind Farm Filed Wind 22.6 km 108
Cloich Forest Wind Farm Filed Wind 22.7 km 67.2
Limmer Hill wind farm -- Canceled Wind 22.8 km 99
Kittymuir Farm wind farm -- Postponed Wind 22.9 km 1.6
High Blackwoodyards Farm wind farm -- Postponed Wind 23.0 km 2
Easter Drumclair Wood wind farm 1 Announced Wind 23.6 km 4
Easter Drumclair Wood wind farm 2 Announced Wind 23.6 km 4
Easter Drumclair Wood wind farm 3 Announced Wind 23.6 km 4
Easter Drumclair Wood wind farm 4 Announced Wind 23.6 km 6
Kilrubie wind farm -- Canceled Wind 24.0 km 21
Brew Dog Brewery Condor Glen solar project -- Announced Solar 24.5 km 1.3

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 28, 2026Supported by National Energy SO Open Data

Attribution