Show on map
G4-VİRANŞEHİR-3 solar farm --G4-VİRANŞEHİR-4 solar farm -- — Announced · Solar · 50 MW · 1.0 km awayŞanlıurfa Viranşehir solar farm 2 — Announced · Solar · 64 MW · 1.5 km awayG4-VİRANŞEHİR-1 solar farm -- — Announced · Solar · 50 MW · 2.1 km awayG4-VİRANŞEHİR-9 solar farm -- — Announced · Solar · 50 MW · 2.1 km awayŞanlıurfa Viranşehir solar farm 6 — Announced · Solar · 50 MW · 2.4 km awayŞanlıurfa Viranşehir solar farm 10 — Announced · Solar · 65 MW · 3.8 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

G4-VİRANŞEHİR-3 solar farm --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Şanliurfa, Türkiye

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “utility-scale solar / Assumed PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
G4-VİRANŞEHİR-4 solar farm -- Announced Solar 1.0 km 50
Şanlıurfa Viranşehir solar farm 2 Announced Solar 1.5 km 64
G4-VİRANŞEHİR-1 solar farm -- Announced Solar 2.1 km 50
G4-VİRANŞEHİR-9 solar farm -- Announced Solar 2.1 km 50
Şanlıurfa Viranşehir solar farm 6 Announced Solar 2.4 km 50
Şanlıurfa Viranşehir solar farm 10 Announced Solar 3.8 km 65

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution