Goonabarn Farm Wind Turbines --
- Wind & solar
- Bioenergy
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Bioenergy
- In development
- Under construction
- Operating
Goonabarn Farm Wind Turbines --: the source's site coordinate and 17 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Goonabarn Farm Wind Turbines --
Wind
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Scotland, United Kingdom
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Wind source: “wind / Onshore”
Timeline
- Observed as canceled in GEM (source status: “cancelled”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Glens of Foudland Wind (SRO) Built | Wind | 5.8 km | 26 |
| Hill of Tillymorgan wind farm -- Postponed | Wind | 8.4 km | 2.3 |
| Durran Mains wind farm -- Canceled | Wind | 9.7 km | 2.4 |
| Hill Of Rothmaise wind farm -- Postponed | Wind | 11.1 km | 4.6 |
| Clashindarroch 2 Under construction | Wind | 11.1 km | 63 |
| Hassiewells wind farm -- Postponed | Wind | 12.5 km | 6.9 |
| Cornabo wind farm -- Postponed | Wind | 13.3 km | 2.7 |
| Cornabo, Monymusk wind farm -- Announced | Wind | 13.6 km | 3.9 |
| St Fergus Filed | Solar + storage | 14.2 km | 100 |
| Garlenick Estate 2 - Wind Turbines -- Canceled | Wind | 14.6 km | 6.9 |
| Land to the north west of Hill of Petty (Green Cat Renewables) wind farm -- Announced | Wind | 16.9 km | 3.6 |
| Hill of Carlincraig wind farm -- Postponed | Wind | 17.4 km | 4.6 |
| North Haddo wind farm -- Postponed | Wind | 17.9 km | 1.6 |
| Clashindarroch Built | Wind | 18.4 km | 37 |
| Hill of Blairfowl solar farm -- Postponed | Solar | 21.8 km | 1.5 |
| Thainstone Energy Park Permitted | Waste to energy | 22.1 km | 40 |
| Aultmore Wind Farm (2023) Filed | Wind + storage | 24.2 km | 105 |
Supported by National Energy SO Open Data
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- NESOSupported by National Energy SO Open Data