GRAHAM SOLAR FARM II EXPANSION in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Graham Solar Farm II Expansion
Solar
As filed: GRAHAM SOLAR FARM II EXPANSION
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- In-service date
- (stated)
- Location
- FRESNO County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Kind
- Generation
- Connects at
- Schindler Substation 115 KV BusConnection point0 MW active (0 of 8 projects).
At this site
4 records at GRAHAM SOLAR FARM II EXPANSIONAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | GRAHAM SOLAR FARM II EXPANSION this record | Solar | 20 | Withdrawn |
| Another phase high confidence | GRAHAM SOLAR FARM I EXPANSION | Solar | 20 | Withdrawn |
| Earlier filing, superseded low confidence | GRAHAM SOLAR FARM II | Solar | 20 | Withdrawn |
| Another phase high confidence | GRAHAM SOLAR FARM I | Solar | 20 | Withdrawn |
Also at this interconnection point (4)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- LAGUNA SOLAR FARM Solar, 200 MW, withdrawn at Schindler Substation 115 KV Bus
- DERNOPI SOLAR Solar, 100 MW, withdrawn at Schindler Substation 115 KV Bus
- STEPHEN Solar, 100 MW, withdrawn at Schindler Substation 115 KV Bus
- EXCELSIOR SOLAR Solar, 20 MW, withdrawn at Schindler Substation 115 KV Bus
Sources CAISO
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO