Show on map
Hacihidirlar wind farm --Licensed (Korda Enerji) solar farm -- — Announced · Solar · 6.4 MW · 7.6 km awayLicensed (Greeneco II) solar farm -- — Announced · Solar · 3.3 MW · 9.6 km awayLicensed (Greeneco III) solar farm -- — Announced · Solar · 4.2 MW · 10.0 km awayGreeneco Sarayköy 7 geothermal plant 2 — Under construction · Geothermal · 24.5 MW · 10.2 km awayGreeneco Jes-6 solar farm 2 — Announced · Solar · 6 MW · 11.4 km awayLicensed (Greeneco I) solar farm -- — Announced · Solar · 3.8 MW · 11.4 km awayOrtakci solar project -- — Announced · Solar · 11.7 MW · 13.7 km awayEmirler geothermal power plant -- — Announced · Geothermal · 8 MW · 17.3 km awayYusuf solar project -- — Announced · Solar · 17.2 MW · 24.3 km away
  • Clean firm
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Hacihidirlar wind farm --

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Aydin Province, Türkiye

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Licensed (Korda Enerji) solar farm -- Announced Solar 7.6 km 6.4
Licensed (Greeneco II) solar farm -- Announced Solar 9.6 km 3.3
Licensed (Greeneco III) solar farm -- Announced Solar 10.0 km 4.2
Greeneco Sarayköy 7 geothermal plant 2 Under construction Geothermal 10.2 km 24.5
Greeneco Jes-6 solar farm 2 Announced Solar 11.4 km 6
Licensed (Greeneco I) solar farm -- Announced Solar 11.4 km 3.8
Ortakci solar project -- Announced Solar 13.7 km 11.7
Emirler geothermal power plant -- Announced Geothermal 17.3 km 8
Yusuf solar project -- Announced Solar 24.3 km 17.2

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution