Show on map
- Combustion
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- Under construction
Hebei Li County cogen power station Phase I Unit 2: the source's site coordinate and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hebei Li County cogen power station Phase I Unit 2
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Hebei, China
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Coal source: “coal / ultra-supercritical”
At this site
4 records at Hebei Li County cogen power station Phase II Unit 3At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Hebei Li County cogen power station Phase II Unit 3 | Coal | 660 | Unknown |
| Another phase high confidence | Hebei Li County cogen power station Phase II Unit 4 | Coal | 660 | Unknown |
| Another phase high confidence | Hebei Li County cogen power station Phase I Unit 1 | Coal | 350 | Under construction |
| Another phase high confidence | Hebei Li County cogen power station Phase I Unit 2 this record | Coal | 350 | Under construction |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as under construction in GEM (source status: “construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Hebei Li County cogen power station Phase I Unit 1 Under construction | Coal | 0.0 km | 350 |
| Hebei Li County cogen power station Phase II Unit 3 Unknown | Coal | 0.0 km | 660 |
| Hebei Li County cogen power station Phase II Unit 4 Unknown | Coal | 0.0 km | 660 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.